Ballinacourty , Dungarvan , Co. Waterford
Proposed new dormer dwelling together with a detached garage, a new entrance, septic tank, percolation area, connection to public water supply and ancillary site works.
for change of use for two buildings, one having an eaves height of 5.3m above floor level and a ridge height of 8.1m above floor level and the other building having an eaves height of 3.15m above floor level and a ridge height of 4.73m above floor level from workshop and storage buildings to 64 bed hostel accommodation over 2 floors including dining facsilities, 2 internal padel tennis courts, and for a sewage treatment plant on adjoining lands. The change of use will require alterations to North, South, East and West elevations to incorporate new window and door openings as shown on the elevations submitted at my premises known as Robin Hill, Ballyvaden, Kill,Co.Waterford in accordance with the drawings submitted.
Site location as published by the council. Usually the site itself; occasionally a townland centre.
Copied from the National Planning Applications Database on 30/09/2026. The council file is the record; drawings, the agent's details and any conditions are there, not here.
Proposed new dormer dwelling together with a detached garage, a new entrance, septic tank, percolation area, connection to public water supply and ancillary site works.
for the as constructed location of the partially constructed house. Planning permission is sought for (1) the completion of the partially constructed house, an entrance and a waste water treatment system originally granted planning permission under P.D. 03/1162 and (2) the construction of a garage along with all associated site works
the Refurbishment of an existing Cottage with the addition of an entrance Porch to the rear and to connect to the Public Sewer Network and all associated site works