23 Mardyke St , Athlone , Co. Westmeath
Permission is being sought for change of use of existing public licensed bar at ground floor level to “Sit-in” Restaurant. Permission is also south for external signage to existing shop front.
the development consists of the RETENTION of an extension to an existing single-storey dwelling and a detached domestic garage
Site location as published by the council. Usually the site itself; occasionally a townland centre.
Copied from the National Planning Applications Database on 30/09/2026. The council file is the record; drawings, the agent's details and any conditions are there, not here.
Permission is being sought for change of use of existing public licensed bar at ground floor level to “Sit-in” Restaurant. Permission is also south for external signage to existing shop front.
Retention planning permission and planning permission is being sought. Retention Permission is being sought for a stand alone beauty parlour at the rear of her existing hairdressers at “Fashion Lady”, Brideswell Street, Athlone, Co. Westmeath. The application will also include retention permission for an extension to the rear of her existing hairdressers and retention permission for two number apartments on the first floor. Also included in this application is planning permission for the following: (a) Alteration to the first floor apartments which will include the reduction of one bedroom in each of the apartments. (b) An extension to the ground floor hairdressers which will connect the existing hairdressers to the stand alone beauty parlour at the rear.(c) The inclusion of private open space to the rear of the site for the use of the first floor apartments
proposed development which will consist of high-power electric vehicle charging points and associated infrastructure consisting of the following: I. Installation of 8no. electric vehicle charging bays with 8no. Tesla branded illuminated charging units and associated signage, II. Installation of proposed Tesla supercharger power cabinet equipment, III. Installation of proposed modular substation, IV. Erection of associated EV signage, V. All associated site development works including revisions to landscaping, surfacing & line marking.